A gauntlet test is being conducted today on 777-9 WH001.
Scheduled for high lift control system testing on July 28.
Scheduled for high lift control system testing on July 28.
KC-46A 16-46015 was moved from the Everett Modification Center to the fuel dock stall F-1.
WF212 Qatar Cargo 777F A7-BFQ.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.