Monday, April 6, 2009
F-OSYD Air Austral First Flight
April 6, 2009
Friday, April 3, 2009
The Last 747-400
Just behind the door of the 40-22 is a LoadAir Cargo freighter, the last 747-400 to be built, waiting for engines to be installed. Dreamliner Three has been moved to the 747 final body join area. April 3, 2009
Thursday, April 2, 2009
Boeing Everett Flightline
April 2, 2009
Wednesday, April 1, 2009
Dreamliner One
Dreamliner One is still inside the 40-24 April 1, 2009
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)