Monday, September 29, 2008

September 29 Boeing Takeaway


This truck delivered landing gear to the Everett factory, then an engine was loaded on the trailer.

Friday, September 26, 2008

September 26 N573BA


N573BA Boeing VIP jet off Paine Field.

September 26 787 Pressure Test


Pressure testing on the 787 static test frame began in the 40-23 on September 21 and continued through the week. A 3.0 PSI certification was achieved on September 26.

Friday, September 12, 2008

September 12 N576UP


UPS N576UP first flight.

Boeing Train



Train at the rail terminal and union picketers on the Boeing Freeway September 11, 2008.



Two days later BNSF 2076 is in the yard at Goldbar, WA.

Monday, September 8, 2008

September 8 Boeing Tour


The Boeing factory tour is closed during the machinists strike, but there is a complimentary bus tour around the airport.

Saturday, September 6, 2008

Tuesday, September 2, 2008