Thursday, September 29, 2011

Paine Field September 29


787 line 7 at the Everett Modification Center.


The last roof truss was removed from the 787 side of body modification tent this morning. Line 15 was moved out of the tent on September 17.




There was a maintenance engine run on LX-VCB this morning.



JA802A ready to begin another test flight.



Boeing flightline.

1 comment:

  1. About time they moved that "White Tent" out.
    Blocked some prime airplane viewing.

    ReplyDelete

Note: Only a member of this blog may post a comment.