Another 787 appeared on the flightline Saturday morning.
The fatigue test 787, now in the tent on the flightline, will be moved to the fatigue test rig near the 40-41 building on January 30.
A 787 horizontal stabilizer SME is moved from the factory to the field.
787 wingset is moved from the field to the factory.
Cathay Pacific B-KPO does a high speed taxi before first flight.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.