Monday, November 24, 2008

Exclusive: Dreamliner meets Dreamlifter






787 fatigue test airframe has just been moved out of the paint hangar to the fuel dock as N249BA exits taxiway Alpha.







The fatigue test 787 will eventually be moved to the test rig near the 40-41 building to demonstrate 165,000 simulated flight cycles.