ANA JA784A first flight.
Static pressure cone installed on 747-8 N747EX.
Static pressure cone installed on N787EX. A selcal check (BQ-GM) was conducted with Boeing Everett Radio in the morning. At 6:00 PM Mike Carriker began a simulated 100 knot RTO on RWY 16R and takeoff on 34L.
Static pressure cone installed on 747-8 N747EX.
Static pressure cone installed on N787EX. A selcal check (BQ-GM) was conducted with Boeing Everett Radio in the morning. At 6:00 PM Mike Carriker began a simulated 100 knot RTO on RWY 16R and takeoff on 34L.
Hello! THanks for another update! I was wondering if there is any news on when the N787EX might be going for it's first flight.
ReplyDeleteI believe it was planned on the 22 of Dec. But is this confirmed? I missed ZA001's flight. Would be nice if I can catch ZA002's 1st flight!
ReplyDeleteThanks for the update. :o) Too bad ZA001 is now at BFI (we can't see what's happening). Does anyone know if a flight testing schedule is posted anywhere?
ReplyDelete