Everett flightline May 26, 2009. Work performed on N787BA today included testing the High Lift Control System for flaps and slats, running the RAT twice to check RPM and amperage, and two HF radio checks. In the afternoon LCF N747BC arrived from Wichita with a 787 section 41 nose.